- Bushing Power Factor and Capacitance is specified for step voltage regulators in acceptance testing at clause 7.12.1.1.B.4 of ANSI/NETA ATS-2025. Value: step voltage regulators.
- Bushing Power Factor and Capacitance is specified for step voltage regulators in maintenance testing at clause 7.12.1.1.B.4 of ANSI/NETA MTS-2023. Value: step voltage regulators.
- Bushing Power Factor and Capacitance is specified for liquid-filled transformers in acceptance testing at clause 7.2.2.B.5 of ANSI/NETA ATS-2025. Value: liquid-filled transformers.
- Bushing Power Factor and Capacitance is specified for liquid-filled transformers in maintenance testing at clause 7.2.2.B.5 of ANSI/NETA MTS-2023. Value: liquid-filled transformers.
Elsewhere in the family
- Bushing power factor and capacitance more on this entry on Circuit Breaker Reference
- Bushing Power Factor and Capacitance more on this entry on Electrical Testing Reference
- ANSI/NETA ATS-2025 Standard for Acceptance Testing Specifications related entry on Electrical Testing Reference
- ANSI/NETA MTS-2023 Standard for Maintenance Testing Specifications related entry on Electrical Testing Reference
Sources
- ANSI/NETA ATS-2025, Acceptance Testing Specifications for Electrical Power Equipment and Systems, 2025 edition, NETA. Cited: clause 7.12.1.1.B.4; clause 7.2.2.B.5. Held as: Purchased single-user copy. Publisher page
- ANSI/NETA MTS-2023, Maintenance Testing Specifications for Electrical Power Equipment and Systems, 2023 edition, NETA. Cited: clause 7.12.1.1.B.4; clause 7.2.2.B.5. Held as: Purchased single-user copy. Publisher page
Obtaining the documents
- ANSI/NETA ATS-2025: publisher catalog or sales page
- ANSI/NETA MTS-2023: publisher catalog or sales page
Changelog (4 entries)
| Date | Revision | Change |
|---|---|---|
| 2026-10-13 | created (tests.bushing-power-factor-and-capacitance.equipment.regulator.acceptance) | |
| 2026-10-13 | created (tests.bushing-power-factor-and-capacitance.equipment.regulator.maintenance) | |
| 2026-10-13 | created (tests.bushing-power-factor-and-capacitance.equipment.transformer-fluid.acceptance) | |
| 2026-10-13 | created (tests.bushing-power-factor-and-capacitance.equipment.transformer-fluid.maintenance) |
Cite this page
Cite the governing standard for the fact itself; cite this page as the finding aid.
"Bushing power factor and capacitance." Transformer Testing Reference. 2026-10-13. https://www.transformertestingreference.com/tests/bushing-power-factor-and-capacitance/.
Transformer Testing Reference, Bushing power factor and capacitance (Oct. 13, 2026), https://www.transformertestingreference.com/tests/bushing-power-factor-and-capacitance/.
@misc{etr-tests-bushing-power-factor-and-capacitance,
title = {Bushing power factor and capacitance},
howpublished = {\url{https://www.transformertestingreference.com/tests/bushing-power-factor-and-capacitance/}},
organization = {Transformer Testing Reference},
publisher = {Transformer Testing Reference},
year = {2026},
note = {last substantive change 2026-10-13}
}{{cite web |title=Bushing power factor and capacitance |website=Transformer Testing Reference |publisher=Transformer Testing Reference |url=https://www.transformertestingreference.com/tests/bushing-power-factor-and-capacitance/ |date=2026-10-13 |access-date=}}